Previous (Autumn 2010) drilling (4,356 metres distributed over 14 DDHS) has validated previous results and extended the mineralized vein clusters. Some 2011 assays definition drilling (1,234.99 metres distributed over 6 DDHS) provided enough information for a resource calculation and add additional ounces of gold to the Lamaque Project.
The recent validation and verification drilling conducted in 2006-2011 (10,142.72 meters for 34 DDHs) permitted to re-evaluate the resource using adequate data corroboration with Quality Assurance, Quality Control (QAQC protocol) and compliant NI 43-101 Inferred Resources of 861,000 Tonnes at 2.10 g/t Au (58,000 Ounces) was calculated (see appendix IX) for reference report prepared by Mr. Christian D'Amours of Geopointcom Consulting of Val-d'Or, dated December 2010. Additional drilling is necessary to certify the model and categorize the resources.
Table of most significant values obtained in the 2011 drill campaign
| Drillhole # |
From (m) |
To (m) |
Length (m) |
Sample # |
Au g/t |
| FOR-11-01 |
31.47 |
31.81 |
0.34 |
J236352 |
6.55 |
| 58.00 |
59.50 |
1.50 |
J236368 |
7.20 |
| 109.00 |
110.50 |
1.50 |
J236391 |
1.22 |
| 116.94 |
118.22 |
1.28 |
J236394 |
2.64 |
| 154.00 |
154.91 |
0.91 |
J236409 |
1.01 |
| FOR-11-02 |
183 |
184.5 |
1.50 |
J236509 |
16.00 |
| FOR-11-03 |
62.46 |
63.86 |
1.4 |
J236275 |
9.24 |
| 130.45 |
131.82 |
1.37 |
J236304 |
1.05 |
| FOR-11-04 |
23 |
23.6 |
0.6 |
J236148 |
1.08 |
| 31.47 |
32 |
0.53 |
J236155 |
9.62 |
| 32 |
33 |
1 |
J236156 |
19.05 |
| 54 |
55.5 |
1.5 |
J236170 |
5.38 |
| 56 |
57.5 |
1.5 |
J236172 |
1.76 |
| 57.5 |
59 |
1.5 |
J236173 |
9.96 |
| 61.5 |
62.35 |
0.85 |
J236176 |
1.03 |
| 72.95 |
74.36 |
1.41 |
J236184 |
2.02 |
| 81.4 |
82.3 |
0.9 |
J236191 |
2.45 |
| 97.5 |
99 |
1.5 |
J236205 |
5.47 |
| 99 |
99.47 |
0.47 |
J236206 |
1.53 |
| 100 |
101.5 |
1.5 |
J236207 |
2.81 |
| 123 |
124 |
1 |
J236215 |
7.46 |
| FOR-11-05 |
19 |
20.36 |
1.36 |
J236001 |
1.11 |
| 20.36 |
21.77 |
1.41 |
J236002 |
1.10 |
| 21.77 |
23 |
1.23 |
J236003 |
1.67 |
| 23 |
24.44 |
1.44 |
J236004 |
4.42 |
| 33.5 |
35 |
1.5 |
J236007 |
6.86 |
| 41.5 |
42.32 |
0.82 |
J236012 |
1.50 |
| 42.32 |
43 |
0.68 |
J236013 |
2.42 |
| 110.9 |
112 |
1.1 |
J236030 |
1.34 |
| 126.49 |
127 |
0.51 |
J236036 |
1.81 |
| 127 |
128.5 |
1.5 |
J236037 |
2.90 |
| FOR-11-06 |
44 |
45.5 |
1.5 |
J236077 |
3.05 |
Table of most significant values obtained in the 2010 drill campaign
| Drillhole # |
From (m) |
To (m) |
Length (m) |
Sample # |
Au g/t |
| FOR-10-01 |
163.9 |
164.6 |
0.70 |
143492 |
4.30 |
| FOR-10-01 |
166.25 |
167.37 |
1.12 |
143494 |
8.93 |
| FOR-10-01 |
167.37 |
168.75 |
1.38 |
143495 |
0.50 |
| FOR-10-01 |
169.75 |
170.3 |
0.55 |
143497 |
1.67 |
| FOR-10-01 |
170.3 |
171.8 |
1.50 |
143498 |
3.33 |
| FOR-10-01 |
173.1 |
173.6 |
0.50 |
143500 |
2.73 |
| FOR-10-01 |
173.6 |
174.05 |
0.45 |
143501 |
2.8 |
| FOR-10-01 |
175.3 |
175.75 |
0.45 |
143504 |
3.56 |
| FOR-10-02 |
76.2 |
77.3 |
1.10 |
143584 |
1.23 |
| FOR-10-02 |
113.75 |
114.8 |
1.05 |
143588 |
5.51 |
| FOR-10-02 |
141 |
141.85 |
0.85 |
143594 |
64.95 |
| FOR-10-02 |
276.45 |
277.05 |
0.60 |
143634 |
3.87 |
| FOR-10-03 |
172.25 |
173.4 |
1.15 |
143708 |
2.96 |
| FOR-10-03 |
336.38 |
337.55 |
1.17 |
143776 |
1.27 |
| FOR-10-03 |
480.35 |
481.83 |
1.48 |
143818 |
1.84 |
| FOR-10-03 |
494.4 |
495.1 |
0.7 |
143823 |
3.36 |
| FOR-10-04 |
55.7 |
56.7 |
1 |
143900 |
2.2 |
| FOR-10-05 |
68.41 |
68.87 |
0.46 |
143985 |
4.56 |
| FOR-10-05 |
72.89 |
73.39 |
0.50 |
143986 |
15.36 |
| FOR-10-05 |
82.18 |
83.51 |
1.33 |
143988 |
15.13 |
| FOR-10-05 |
85.53 |
86.83 |
1.30 |
143989 |
1.7 |
| FOR-10-05 |
86.83 |
87.67 |
0.84 |
143990 |
3.24 |
| FOR-10-05 |
89.76 |
90.82 |
1.06 |
148065 |
3.54 |
| FOR-10-05 |
90.82 |
92.00 |
1.18 |
143992 |
7.38 |
| FOR-10-05 |
108.5 |
110.00 |
1.50 |
148068 |
3.9 |
| FOR-10-05 |
110 |
110.82 |
0.82 |
143995 |
3.94 |
| FOR-10-05 |
117.6 |
118.00 |
0.40 |
144001 |
1.47 |
| FOR-10-05 |
158 |
158.90 |
0.90 |
144007 |
1.1 |
| FOR-10-05 |
172.3 |
172.70 |
0.40 |
144010 |
1.6 |
| FOR-10-05 |
175.5 |
177.00 |
1.50 |
144012 |
5.73 |
| FOR-10-05 |
231 |
232.48 |
1.48 |
144041 |
1.37 |
| FOR-10-06 |
44.96 |
46.27 |
1.31 |
144086 |
3.03 |
| FOR-10-06 |
56.5 |
57.7 |
1.2 |
144092 |
1.67 |
| FOR-10-06 |
62.5 |
64 |
1.5 |
144094 |
1.4 |
| FOR-10-06 |
155.82 |
157.27 |
1.45 |
144134 |
6.68 |
| FOR-10-06 |
169 |
170.5 |
1.5 |
144144 |
5.59 |
| FOR-10-06 |
173.72 |
175.22 |
1.5 |
144147 |
6.36 |
| FOR-10-06 |
186.57 |
187.4 |
0.83 |
144150 |
1.2 |
| FOR-10-06 |
259.13 |
260 |
0.87 |
144179 |
2.03 |
| FOR-10-07 |
162 |
162.89 |
0.89 |
144249 |
3.56 |
| FOR-10-08 |
46 |
47.26 |
1.26 |
146100 |
14.57 |
| FOR-10-08 |
68.6 |
69.95 |
1.35 |
146113 |
3.06 |
| FOR-10-08 |
85.71 |
86.88 |
1.17 |
146119 |
1.36 |
| FOR-10-09 |
27 |
28.2 |
1.2 |
146159 |
1.5 |
| FOR-10-09 |
28.2 |
29 |
0.8 |
146160 |
3.77 |
| FOR-10-09 |
29 |
30.18 |
1.18 |
146161 |
1.26 |
| FOR-10-09 |
39.63 |
41 |
1.37 |
146164 |
1.43 |
| FOR-10-09 |
44.82 |
46.15 |
1.33 |
146169 |
1.23 |
| FOR-10-09 |
51.95 |
53.27 |
1.32 |
146171 |
2.03 |
| FOR-10-09 |
72.24 |
73.64 |
1.4 |
146176 |
31.18 |
| FOR-10-09 |
146.59 |
148.02 |
1.43 |
146203 |
5.04 |
| FOR-10-10 |
88.6 |
89 |
0.4 |
146237 |
2.17 |
| FOR-10-10 |
94.4 |
95.43 |
1.03 |
146240 |
23.89 |
| FOR-10-10 |
108.2 |
109.2 |
1 |
146245 |
46.24 |
| FOR-10-10 |
135.5 |
136 |
0.5 |
146256 |
1.3 |
| FOR-10-10 |
196.55 |
196.93 |
0.38 |
146276 |
1.86 |
| FOR-10-10 |
204 |
204.6 |
0.6 |
146279 |
2.2 |
| FOR-10-10 |
293 |
294 |
1 |
146314 |
4.22 |
| FOR-10-10 |
294 |
295.23 |
1.23 |
146315 |
1.06 |
| FOR-10-11 |
38.7 |
39.4 |
0.7 |
146324 |
1.07 |
| FOR-10-11 |
52.81 |
54.24 |
1.43 |
146331 |
1.2 |
| FOR-10-11 |
54.24 |
54.57 |
0.33 |
146332 |
39.08 |
| FOR-10-11 |
54.57 |
56.04 |
1.47 |
146333 |
2.8 |
| FOR-10-11 |
62.4 |
63.67 |
1.27 |
146337 |
3.76 |
| FOR-10-11 |
92.62 |
92.82 |
0.2 |
146350 |
1.26 |
| FOR-10-11 |
163.31 |
164.11 |
0.8 |
146372 |
1.8 |
Table of most significant values obtained in the 2009 drill program
| Drillhole # |
From (m) |
To (m) |
Length (m) |
Sample # |
Au g/t |
| FOR-09-01 |
86.20 |
86.85 |
0.65 |
144267 |
1.470 |
| FOR-09-01 |
124.17 |
124.58 |
0.41 |
144275 |
1.300 |
| FOR-09-01 |
223.43 |
224.30 |
0.87 |
144319 |
1.830 |
| FOR-09-02 |
35.35 |
36.00 |
0.65 |
144342 |
2.03 |
| FOR-09-02 |
36.00 |
36.55 |
0.55 |
147827 |
0.3 |
| FOR-09-02 |
79.95 |
80.15 |
0.20 |
145201 |
0.23 |
| FOR-09-02 |
80.15 |
80.85 |
0.70 |
144359 |
6.69 |
| FOR-09-02 |
80.85 |
81.40 |
0.55 |
144360 |
1.13 |
| FOR-09-02 |
90.45 |
90.85 |
0.40 |
144362 |
9.42 |
| FOR-09-02 |
90.85 |
91.50 |
0.65 |
144363 |
1.77 |
| FOR-09-02 |
91.50 |
92.17 |
0.67 |
144364 |
5.18 |
| FOR-09-02 |
92.17 |
92.82 |
0.65 |
144365 |
1.13 |
| FOR-09-02 |
92.82 |
93.00 |
0.18 |
145209 |
0.2 |
| FOR-09-02 |
109.35 |
111.00 |
1.65 |
145210 |
0.27 |
| FOR-09-02 |
111.00 |
111.85 |
0.85 |
144370 |
8.3 |
| FOR-09-02 |
175.50 |
175.89 |
0.39 |
144385 |
1.1 |
| FOR-09-02 |
187.20 |
188.30 |
1.10 |
144391 |
0.93 |
| FOR-09-02 |
188.30 |
188.73 |
0.43 |
144392 |
29.91 |
| FOR-09-02 |
188.73 |
189.85 |
1.12 |
144393 |
6.45 |
| FOR-09-02 |
189.85 |
190.90 |
1.05 |
145218 |
<0.100 |
| FOR-09-02 |
190.90 |
191.39 |
0.49 |
144394 |
0.1 |
| FOR-09-02 |
204.60 |
205.20 |
0.60 |
144399 |
1.5 |
| FOR-09-02 |
277.40 |
277.70 |
0.30 |
144418 |
3.3 |
| FOR-09-02 |
277.75 |
278.75 |
1.00 |
144419 |
3.69 |
| FOR-09-03 |
222.95 |
223.60 |
0.65 |
145233 |
0.5 |
| FOR-09-03 |
223.60 |
224.60 |
1.00 |
144477 |
15.05 |
| FOR-09-03 |
224.60 |
225.90 |
1.30 |
145234 |
0.23 |
| FOR-09-03 |
262.73 |
264.23 |
1.50 |
145235 |
0.17 |
| FOR-09-03 |
264.23 |
264.88 |
0.65 |
144485 |
24.52 |
Table of most significant values obtained in the 2007 drill program
| Drillhole # |
From (m) |
To (m) |
Length (m) |
Sample # |
Au g/t |
| FOR-07-01 |
171.91 |
172.82 |
0.91 |
116325 |
1.029 |
| FOR-07-01 |
218.85 |
219.46 |
0.61 |
116353 |
4.971 |
| FOR-07-01 |
239.12 |
240.18 |
1.06 |
116356 |
2.64 |
| FOR-06-03 |
98.15 |
98.76 |
0.61 |
101655 |
1.269 |
| FOR-06-03 |
120.94 |
121.43 |
0.49 |
101663 |
1.029 |
| FOR-06-03 |
193.24 |
193.79 |
0.55 |
101680 |
1.029 |
| FOR-06-03 |
211.9 |
212.38 |
0.48 |
101685 |
3.497 |
| FOR-07-02 |
218.39 |
219.24 |
0.85 |
116443 |
1.474 |
| FOR-07-02 |
225.86 |
226.77 |
0.91 |
116445 |
0.24 |
| FOR-07-02 |
226.77 |
227.32 |
0.55 |
116446 |
2.777 |
| FOR-07-02 |
227.32 |
227.99 |
0.67 |
116447 |
4.869 |
| FOR-07-02 |
227.99 |
228.9 |
0.91 |
116448 |
0.137 |
| FOR-07-05 |
275.23 |
276.15 |
0.92 |
119179 |
2.743 |
| FOR-07-05 |
276.15 |
277.15 |
1 |
147556 |
0.76 |
| FOR-07-05 |
305.41 |
305.71 |
0.3 |
119184 |
1.817 |
| FOR-07-05ext |
368.63 |
369.42 |
0.79 |
119076 |
1.47 |
| FOR-07-05ext |
382.83 |
383.8 |
0.97 |
119081 |
1.06 |
| FOR-07-05ext |
405.08 |
406.58 |
1.5 |
147584 |
2.36 |
| FOR-07-05ext |
411.69 |
412.24 |
0.55 |
119092 |
10.59 |
| FOR-07-05ext |
414 |
415.14 |
1.14 |
147590 |
1.2 |
| FOR-07-07 |
39.87 |
40.26 |
0.39 |
116581 |
131.657 |
| FOR-07-07 |
54.86 |
55.32 |
0.46 |
116591 |
2.811 |
| FOR-07-07 |
55.32 |
56.24 |
0.92 |
116592 |
5.966 |
| FOR-07-07 |
56.85 |
57.15 |
0.30 |
116594 |
1.131 |
| FOR-07-07 |
74.49 |
75.19 |
0.70 |
116604 |
1.063 |
| FOR-07-07 |
77.21 |
77.72 |
0.51 |
116608 |
12.549 |
| FOR-07-07 |
276.15 |
277.06 |
0.91 |
116705 |
1.371 |
| FOR-07-07 |
290.14 |
290.75 |
0.61 |
116711 |
1.406 |
| FOR-07-07 |
295.35 |
295.81 |
0.46 |
116717 |
1.063 |
| FOR-07-07 |
318.21 |
318.61 |
0.40 |
116739 |
4.149 |
Table of most significant values obtained in the 2006 drill campaign
| Drillhole # |
From (m) |
To (m) |
Length (m) |
Sample # |
Au g/t |
| FOR-06-01 |
143.44 |
144.35 |
0.91 |
101562 |
2.743 |
| FOR-06-01 |
172.91 |
173.52 |
0.61 |
101566 |
5.280 |
| FOR-06-01 |
192.02 |
192.82 |
0.80 |
101568 |
2.229 |
| FOR-06-01 |
217.51 |
218.24 |
0.73 |
101579 |
2.469 |
| FOR-06-01 |
218.24 |
219.74 |
1.50 |
147979 |
1.230 |
| FOR-06-01 |
220.95 |
221.59 |
0.64 |
101580 |
5.246 |
| FOR-06-01 |
247.85 |
249.35 |
1.50 |
147987 |
4.200 |
| FOR-06-02 |
158.04 |
158.95 |
0.91 |
101617 |
6.171 |
| FOR-06-02 |
159.72 |
160.63 |
0.91 |
101619 |
1.131 |
| FOR-06-02 |
160.63 |
161.06 |
0.43 |
101620 |
2.469 |
| FOR-06-02 |
161.06 |
161.48 |
0.42 |
101621 |
7.714 |
| FOR-06-02 |
161.48 |
162.46 |
0.98 |
101622 |
2.263 |
| FOR-06-02 |
162.46 |
163.07 |
0.61 |
101623 |
2.914 |
| FOR-06-02 |
165.08 |
165.75 |
0.67 |
101627 |
4.937 |
| FOR-06-02 |
180.56 |
181.30 |
0.74 |
101629 |
1.303 |
| FOR-06-03 |
98.15 |
98.76 |
0.61 |
101655 |
1.269 |
| FOR-06-03 |
120.94 |
121.43 |
0.49 |
101663 |
1.029 |
| FOR-06-03 |
193.24 |
193.79 |
0.55 |
101680 |
1.029 |
| FOR-06-03 |
211.90 |
212.38 |
0.48 |
101685 |
3.497 |